|
|
| SCHEME
OPEN FOR SERVING / RETIRED GOVT. OFFICERS / THEIR DEPENDANTS
/ FAMILIES. CO-APPLICANTS WITH SON / DAUGHTER ETC. ACCEPTABLE
|
|
|
 |
SALIENT FEATURES : |
|
|
| Registration open on "first come-first served basis" Sizes, Costs & Availability as follows: |
|
| PHASE-1 |
Sl. No. |
Size |
Cost(All Inclusive) |
Configuration |
Availability |
Status Of Registration |
| 01 |
1275 Sq Ft |
32.0 Lakhs |
2 BHK + Study |
No Vacancy |
Closed |
| 02 |
1500 Sq Ft |
36.9 Lakhs |
3 BHK |
No Vacancy |
Closed |
| 03 |
1815 Sq Ft |
43.29 Lakhs |
4 BHK(3 BHK + SQ) |
No Vacancy |
Closed |
| 04 |
1890 Sq Ft |
47.9 Lakhs |
4 BHK |
No Vacancy |
Closed |
| 05 |
2215 Sq Ft |
54.9 Lakhs |
4 BHK |
No Vacancy |
Closed |
| 06 |
3775 Sq Ft |
94.9 Lakhs |
4 BHK (3 BHK + SQ) |
No Vacancy |
Closed |
|
|
| |
|
|
| |
All Clearances Obtained : (1) Licence. Director, Town & Country Planning, (TCP) Haryana, Memo No. DS-07/31919 dated 27-12-07 and Licence No 40 of 2008, dated 02 March 2008, Endst No. DS-2008/5516, pertaining to grant of Licence for setitng up goroup housing for 11.478 Acres. (2) AAI Clearance. Airports Authority of India (AAI) NOC obtained vide AAI letter AAI/NOC/2008/392/108-110 dated 20 Jan 2009. (3) Building Plans. Approval of building plans sanctioned vide TCP Memo No ZP-382/2953 dated 2 April 2009. |
| |
| CONFIRMED ALLOTMENT PROCEDURE |
| |
| REGISTRATION AMOUNT : 10% . Allotment OF FLOORS & HOUSE NUMBER WILL BE DONE ONLY ON RECEIPT OF 10%. |
| |
| 10% is Rs 3 Lakhs for 1200 Sq Ft, Rs 3.7 Lakhs for 1500 Sq Ft & Rs 4.3 Lakhs for 1800 Sq ft. Rs 5.4 Lakhs for 2215 Sq Ft & Rs 7.4 Lakhs for 2900 Sq ft apartment. On payment of 50000 a flat will be reserved for the applicant, provided 10% is received within 30 days. |
| |
| No draw of lots. Once applicant pays 10%, member will be asked for 3 preferences of floors. GOWO tries to accommodate most members in their 1st, 2nd, or 3rd choice. If all members ask only for 1 st /2 nd /3 rd floors then only the allotment of those floors will be done by lottery / draw of lots. |
| |
| Members who do not make timely payments of 10% within 30 days will not be allotted. |
| |
GOWO will not accept or keep 10% amount from any member if his allotment is not
confirmed. Once total number of houses in any category are completed, the registration
will be
closed and it will be marked in red on the website in front of that category. |
| |
| LOCATION : |
 |
Sector 37-C (Opposite Sector 9 & 10) - About 2 Km on the Right side from Hero Honda Chowk. For Site Visits please call Avnish on - 9212974544 |
|
| |
| PAPERWORK / BUILDER BUYER AGREEMENT / BANK LOAN |
 |
REGISTRATION : 10% FOR ALLOTMENT. Those who need some extra time to arrange 10%, can take extensions in writing or email. |
 |
RECEIPT FOR REGISTRATION AMOUNT : On every payment a receipt will be sent by post on the postal address indicated by you in the application form. Three choices of floors and amount of bank loan required will also be asked along with 10%. |
 |
ALLOTMENT ON RECEIPT OF 10 % : : Allotment of house number & floor will be done on receipt of 10% payment. First allotment is likely to be done by mid Nov 09, for those members who have paid 10%. |
|
 |
CHOICE OF FLOORS : Please indicate your first 3 choices of floors by letter / email along with 10% payment. GOWO will try to accommodate most floor requests based on the three choices. in case of a tie, draw of lots will be resorted to. |
 |
BUILDER BUYER AGREEMENT : Once 10% is received, the builder buyer agreement will be signed after the allotment of flat number. |
 |
BANK LOAN PAPERWORK : Bank loan has been approved. PLEASE NOTE THAT BANK LOAN WILL BE AVAILABLE TO YOU ONLY AFTER A FLAT NUMBER IS ALLOTTED AND BUILDER BUYER AGREEMENT IS SIGNED. GOWO will assist in the paperwork for bank, specially for out station officers / those abroad and senior citizens. |
|
 |
HOME LOANS FOR MEMBERS : Loan has been approved from 4 banks INCLUDING SBI. We will be making available the numbers and email ids of all participating banks who will get your bankloan approved. They will advise you on all bank formalities / eligibility & help you get your home approved. |
 |
After registration amount of 10%, balance payment will be construction linked as indicated in the schedule below. |
 |
Possession within 30 months. + buffer 6 months & penal interest @ Rs 5.00 per Sq ft / per month, would be paid by GOWO to members if possession is delayed beyond 36 months. (translates to a minimum of 7500/ - per month for a 1500 sq ft apartment size.) |
|
 |
SPECIFICATIONS |
| |
 |
Please See below |
| |
| FLOOR PLANS |
| » click on the thumbnails to view enlarge Floor Plans |
| |
|
| |
|
|
|
|
- Stilts + 14 Storey apartments. (There is no Ground Floor. Ground
floor is only stilts parking)Covered / second car parking under the building on stilts – Additional
(100,000.00)
NOW NOT AVAILABLE – no vacancy,
since only 16 covered car parks are availableunder each building.
These are already full now.
|
| INCLUSIONS |
 |
Cost includes, security, Only one designated open parking space, club membership EDC, IDC, PLC (At current Govt rates). |
|
| |
| EXCLUSIONS |
 |
Cost does not include stamp duty to be paid at the time of registration after possession, RWA / Society charges to be paid nearing completion |
 |
All approvals obtained. |
 |
Construction Started in Oct 09. |
 |
HOME LOAN. Home loan available from a choice of 4 banks. GOWO will get the home loan approved for individuals. Loan amounts will depend upon the individual's paying capacity. For senior citizens / retired officers - it is advisable that you take the house in joint ownership with your children - so that the eligibility amounts increase. Builder buyer agreement will be signed between the Bank, member, APT and GOWO. |
|
| |
| BASIC AMENITIES : |
 |
One house will be handed over to the GOWO society, which can be used as a guest house for elderly citizens when required (on temporary basis). Property will belong to GOWO - Trust - to be used at the joint discretion of GOWO & the society. |
 |
One ambulance will be provided which should be able to give comfort in the event of need to not just the society but also to the general area – to be managed by GOWO & Society reps. |
 |
One car will be provided round the clock to the society to be used by elderly / senior citizens who can't self-drive. |
 |
Any other basic amenity / requirement can be discussed with GOWO committee by the RWA and if within the means & funds of GOWO, will be provided. |
 |
One coordinating member will be nominated by GOWO, whose services can be used by outstation officers / families who wish to have their apartments maintained and looked after when they are not in station. |
 |
One Rider (DR) with a bike who can be sent on small errands will be provided by GOWO – specially for senior citizens. |
 |
Shopping complex providing basic amenities. |
 |
Walking / jogging tracks, |
 |
Play park / areas for children· |
 |
Crèche· Landscaped gardens, |
 |
Extensive sports facilities, |
 |
Swimming pool |
 |
Gym with steam and sauna |
 |
Yoga and meditation rooms |
 |
Club + banquet hall. |
 |
Library / reading room |
 |
Lifts |
 |
24 hr power back up |
 |
MULTI LAYER SECURITY NETWORK |
|
| |
 |
Manned and secure entry to the complex |
|
| |
| PROCEDURE TO BE FOLLOWED BY MEMBERS : |
 |
All payments are to be paid in favour of “GOWO”, payable at New Delhi through At Par Cheques otherwise by Demand Drafts only. |
|
| |
All payments / letters are to be posted / couriered to / hand delivered
to
GOWO Office
UG-47 & 48, Ansal Chamber -2
Bikaji Cama Place. New Delhi – 110066 |
| |
| PROCEDURE FOR APPLICATION : |
 |
Download application form from the web site. |
 |
Application form duly filled up along with DD of Registration Amount to be sent to UG-47 & 48, Ansal Chamber -2
Bikaji Cama Place. New Delhi – 110066 |
 |
General Rules of GOWO shall apply. |
 |
Out station members to send only drafts in favour of GOWO. |
 |
Please send through registered post only to the mailing address of GOWO. . |
 |
Seniority will be maintained as per receipt of application form. |
 |
Receipt of registration amount shall be forwarded to applicants on their postal / mailing address. |
 |
PAYMENT SCHEDULE : CONSTRUCTION LINKED PAYMENT SCHEDULE AS FOLLOWS : |
|
| Construction Linked Payment
Schedule |
|
| On registration |
10 % FOR ALLOTMENT. |
After
10% PAYMENTS ALLOTMENT LETTER WILL BE ISSUED + BUILDER BUYER
AGREEMENT WILL BE SIGNED + HOME LOAN FORMALITIES WILL BE INITIATED
BY GOWO. |
| On Start of Excavation |
10% |
| On foundation laying/ or start of construction |
9% |
| On start of Stilt Slab |
10% |
| On start of First floor Roof Slab |
7% |
| On start of Third floor Roof Slab |
7% |
| On start of Fifth floor Roof Slab |
7% |
| On start of Seventh floor Roof Slab |
7% |
| On start of Ninth floor Roof Slab |
7% |
| On start of Eleventh floor Roof Slab |
7% |
| On start of Thirteenth Floor Roof Slab |
7% |
| On start of Internal Plaster |
7% |
| At the time of Offer of Possession |
5% |
|
| |
| Specifications |
| |
| LIVING, DINING & LOBBY/ PASSAGE |
| Floors |
Vitrified Tiles |
| Walls |
Oil bound distemper(OBD) with pleasing shade |
| Ceiling |
OBD |
| BEDROOMS |
| Floors |
Wooden laminated flooring |
| Walls |
OBD with pleasing shade |
| Ceiling |
OBD |
| BALCONIES |
| Floors |
Antiskid Ceramic Tiles |
| Walls/ Ceiling |
Permanent Paint Finish |
| KITCHEN |
| Floors |
Antiskid Ceramic Tiles |
| Fixture & Fittings |
Single bowl stainless steel sink with drain board
and with CP fittings |
| Walls |
2 feet high Ceramic Tiles above counter &
OBD in balance area. Provision for water purifier and hot and
cold water. |
| Bathroom Counter |
Granite |
| Fixture & Fittings |
CP fittings, WC, wash basin & mirror. Provision
for hot & cold water supply |
| Walls |
Ceramic tiles till 7’0” height in wet areas,
Mirror & Acrylic Emulsion Combination elsewhere. |
| SERVANT ROOM |
| Floors |
Ceramic Tiles |
| Walls |
OBD |
| Ceiling |
OBD |
| DOORS |
| Internal |
Seasoned Hardwood frames with flush panel door |
| Entrance Doors |
Teak Veneered & Polished shutter |
| Fixture & Fittings |
Bath Tub, Granite Counter |
| External Doors & Windows |
Aluminum powder coated with double rebate |
| Electrical |
Copper Electrical wiring throughout in concealed
conduit with provisions for Light point, Power point with protective
MCBs and modular switches. TV & Phone Sockets in every room. |
| Security Sytem/ Fire Fighting System |
Single Entrance & Exit, gated community.
Security Card System for entrance into the complex. Fire Fighting
System. |
|
Earthquake resistant R.C.C. framed structure
with brickwork infill. |
| Structure |
Long lasting paint finish |
| Façade |
Long lasting paint finish |
|
| |
* All SPECIFICATION ARE TENTATIVE AND INDICATIVE FINAL SPECIFICATION WILL BE MENTIONED IN THE BUILDER-BYER AGREEMENT. |
| |
| CONTACT DETAILS : |
| |
| Mobile No :- |
 |
Lt. Col. KP Singh (Retd.) - 9650776444 |
|
| |
Office:
Email Id: |
| |
| to download application form |
|
|